Location | Kuala Lumpur Malaysia |
The Putrajaya Line (previously known as Sungai Buloh-Serdang-
Putrajaya Line) is the second line of the KVMRT Project to be
developed.
The alignment will have a length of 57.7km, consisting of 44.2km
of elevated tracks and 13.5km running through underground
tunnels. It will have 36 operational stations of which 27 are
elevated and 9 underground. A further 4 stations have been
provided for the future.
There will be 10 interchange stations and connecting stations,
making it much easier for commuters to transfer from the
Putrajaya Line to existing and future rail lines, including the future
Kuala Lumpur-Singapore High Speed Rail. Sixteen stations will have
park and ride facilities
BIM LOD-400 and Services Integration
MEP Modeling & Coordination
BIM Clash Detection
BOQ’s from BIM Model
As-Built Model & Drawings
Visualization