background

KVMRT Line 2 Stations

KVMRT Line 2 Stations
Location Kuala Lumpur Malaysia
Project Information

The Putrajaya Line (previously known as Sungai Buloh-Serdang- Putrajaya Line) is the second line of the KVMRT Project to be developed.
The alignment will have a length of 57.7km, consisting of 44.2km of elevated tracks and 13.5km running through underground tunnels. It will have 36 operational stations of which 27 are elevated and 9 underground. A further 4 stations have been provided for the future.
There will be 10 interchange stations and connecting stations, making it much easier for commuters to transfer from the Putrajaya Line to existing and future rail lines, including the future Kuala Lumpur-Singapore High Speed Rail. Sixteen stations will have park and ride facilities

Scope of Work

BIM LOD-400 and Services Integration
MEP Modeling & Coordination
BIM Clash Detection
BOQ’s from BIM Model
As-Built Model & Drawings
Visualization