The park at SeaWorld will have multiple levels of attractions, which will be augmented by extensive, world-class food and beverage venues. Miral Asset Management will operate the facilities, under agreement with SeaWorld Parks Entertainment International.

The total building area makes up of 106 000m² back of house gross floor area and 128 000m². The building consists of 5 indoor park levels and two roof levels, with levels 1 and 2 mostly service levels and levels 3 to 5 attraction levels. The building is divided into six zones including (in construction sequence) Blue World, Abu Dhabi Ocean, Sea of Delight, Polar Ocean, Tropical Ocean and Endless Ocean.

Scope of Work

BIM LOD-400 and Services Integration MEPF Modeling & Coordination & Sheet Production of Various Oceans in the project.
BIM Clash Detection
BOQ’s from BIM Model
As-Built Model
Visualization